1300 mm Coil-to-Coil Polishing Line for NO.4+NO-Oscillating SB Commissioned in 12 Days

Project Date: 13 August 2026\n\nInstallation Location: Xuzhou City, Jiangsu Province, China

GLORY MACHINERY has completed the trial start-up of a 1300 mm coil-to-coil polishing machine line for No.4 finishing For NO.4+Non oscillating SB. The project demonstrates how coordinated installation and commissioning support can help a coil-processing line move into operation quickly.

Project Configuration

  • Line type: 1300 mm coil-to-coil No.4 polishing line with a non-oscillating winder
  • No.4 polishing section: 4 No.4 polishing machines
  • Brushing-roll equipment: one case with 4 brushing rolls and one case with 2 brushing rolls
  • Trial start-up date: 13 August 2026

Fast Installation and Commissioning in 12 Days

polishing line loading at GLORY MACHINERY workshop in Foshan

Loading work at the GLORY MACHINERY workshop in Foshan.

1300mm coil-to-coil polishing line shipment from Foshan

The complete polishing line secured on a flatbed truck for delivery.

From the arrival of the machinery at the factory through installation, power connection, commissioning, and trial start-up, the complete on-site process took only 12 days. This rapid schedule reflects the close coordination of equipment preparation, installation guidance, electrical connection, commissioning support, and start-up assistance from the GLORY MACHINERY service team.

For coil-processing customers, a fast and organized commissioning process helps shorten the time between equipment arrival and production preparation. GLORY MACHINERY continues to focus on practical after-sales support and responsive project service.

Process Line Overview

1. Decoiler and Loading Car

Decoiler and loading car for a 1300 mm coil-to-coil polishing line
Decoiler and loading car

The decoiler and loading car provide the starting section of the line, supporting coil loading and stable material entry into the No.4 finishing process.

2. No.4 Polishing Machine Line

1300 mm coil-to-coil No.4 polishing machine line with brushing-roll assemblies
1300 mm No.4 polishing machine line with brushing-roll assemblies

The polishing section is configured with 4 No.4 polishing machines. The brushing-roll equipment includes one case with 4 brushing rolls and one case with 2 brushing rolls, supporting the specified No.4 surface-finishing process.

3. Cleaning and Drying Machine

Cleaning and drying machine in a 1300 mm coil-to-coil polishing line
Cleaning and drying machine

After polishing, the strip passes through the cleaning and drying section. This stage prepares the strip surface for the next part of the line and helps maintain a clean, stable process flow.

4. Recoiler and EPC System

Recoiler and EPC system for a 1300 mm coil-to-coil polishing line
Recoiler and EPC system

The recoiler and EPC system complete the line layout by guiding and recoiling the processed strip after the polishing, cleaning, and drying stages.

GLORY MACHINERY After-Sales Service

Completing installation, power-up, commissioning, and trial start-up within 12 days highlights the value of fast technical response and organized on-site service. GLORY MACHINERY supports customers through the complete project stage from equipment arrival to line commissioning, with a practical focus on stable start-up and efficient handover.

For more information about 1300 mm coil-to-coil No.4 polishing lines, non-oscillating winders, brushing-roll configurations, or related coil-processing equipment, please contact GLORY MACHINERY.\n\n

Commissioning Video

\n

Watch the 38-second commissioning video from the 13 August 2026 trial start-up.

\n

38-second commissioning video of the 1300 mm coil-to-coil No.4 polishing line.